Upper Floor Addition with Ground Floor Extension 

Before - Front

After - Front

Design Pictures

3D Perspective 1

3D Perspective 1

3D Perspective 2

3D Perspective 2

3D Perspective 3

3D Perspective 3

Upper Floor Plan

Ground Floor plan - Extension

Ground Floor plan - Extension

Ground Floor plan - Extension

Construction Pictures

UF Floor Frame

UF Floor Frame

UF Wall Frames

UF Wall Frames

UF Wall Frames 1

UF Wall Frames 1

UF Roof Frame

UF Roof Frame

UF Roof Frame 1

UF Roof Frame 1

UF Roof Frame 2

UF Roof Frame 2

UF Internal 1

UF Internal 1

UF Internal 2

UF Internal 2

UF Internal 3

UF Internal 3

UF Internal 4

UF Internal 4

Front Roof Gable Demo

Front Roof Gable Demo

Here comes the UF!

Here comes the UF!

Here comes the UF 1

Here comes the UF 1

Steel completed to rear

Steel completed to rear

Steel completed to rear ready for UF

Steel completed to rear ready for UF

UF piece 1 going on!

UF piece 1 going on!

UF piece 2 in the air

UF piece 2 in the air

UF piece 2 going on!

UF piece 2 going on!

Sneak Peak through the crane

Sneak Peak through the crane

Upper Floor landed!

Upper Floor landed!

Upper Floor landed - rear view

Upper Floor landed - rear view

Upper Floor landed - rear view 1

Upper Floor landed - rear view 1

IMG_7460

IMG_7497

IMG_7462

IMG_7471

IMG_6454

IMG_7477

IMG_6455

IMG_7474

IMG_7581

IMG_7582

IMG_7934

Upper Floor Addition

Construction Pictures

IMG_4140

IMG_1967

IMG_1968

IMG_4212

IMG_1965

IMG_1966

Resized_20180526_110028_1024

Resized_20180526_110023_1606

IMG_4588

IMG_5996

IMG_7729

IMG_7386

IMG_3732

IMG_2483

IMG_3323

IMG_3323

IMG_2530

IMG_2523

IMG_2537

IMG_2560

IMG_2558

IMG_2620

Lot 3348 Liberation Street 3d Stair View

IMG_2974

IMG_6579

IMG_4895

IMG_3100

47321005_710711622630067_459620076294976

Upper Floor Addition with Ground Floor Extension

Before

After 

Design Pictures

Construction Pictures

Screen Shot 2017-05-02 at 2.12.17 PM

Screen Shot 2017-05-02 at 2.09.43 PM

Screen Shot 2017-05-02 at 2.13.59 PM

Screen Shot 2017-05-02 at 2.09.55 PM

IMG_4385

IMG_4465

IMG_4466

IMG_2223

IMG_2260

IMG_2239

IMG_2249

IMG_2255

Before

After

Upper Floor Addition

Before  &  After 

Design Pictures

Screen Shot 2017-05-02 at 2.12.17 PM

Screen Shot 2017-05-02 at 2.09.43 PM

Screen Shot 2017-05-02 at 2.13.59 PM

Screen Shot 2017-05-02 at 2.09.55 PM

Construction Pictures

Before

Before

Upper Floor Complete in Factory

Upper Floor Complete in Factory

Upper Floor Complete in Factory1

Upper Floor Complete in Factory

Existing Roof Timber Removed Ready f

Existing Roof Timber Removed Ready for Steels in to Installed.

Complete Upper Floor Being Transport

Complete Upper Floor Being Transported in Pieces.

Complete Upper Floor Being Transport

Complete Upper Floor Being Transported in Pieces.

IMG_6509

Complete Upper Floor Being Transport

Complete Upper Floor Being Transported in Pieces.

First Piece Being Craned onto Existi

First Piece Being Craned onto Existing House.

First Piece of Upper Floor On.

First Piece of Upper Floor On.

Second Piece of Upper Floor Being Cr

Second Piece of Upper Floor Being Craned On.

Second Piece of Upper Floor Going On

Second Piece of Upper Floor Going On.

Third Piece of Upper Floor In the Ai

Third Piece of Upper Floor In the Air.

Third Piece of Upper Floor Going On.

Third Piece of Upper Floor Going On.

IMG_6511

Third Piece of Upper Floor On.

Upper Floor Roof re-Sealed and Compl

Upper Floor Roof re-Sealed and Completed.

Finishing Touch and Ground Floor Roo

Finishing Touches and Ground Floor Roof Replaced.

Single Storey Transformation

Exterior 

Before  &  After 

Kitchen

Before  &  After 

Laundry

Before  &  After 

Bathroom

Before  &  After 

Exterior 

Before  &  After 

Upper Floor Addition

Before  &  After 

Construction Pictures

IMG_1178

Before - Front

2016-01-15 09.07.11

Before - Alfresco - Rear

Upper Floor Wall & Floor Frames Comp

Upper Floor Wall & Floor Frames Complete.

Upper Floor Roof Frame Complete.

Upper Floor Roof Frame Complete.

Upper Floor Roof Frame Complete.1

Upper Floor Roof Frame Complete.

Upper Floor Roof Cover Complete.

Upper Floor Roof Cover Complete.

Upper Floor Insulated Wall System St

Upper Floor Insulated Wall System Started - Front.

IMG_0726Upper Floor Insulated Wall S

Upper Floor Insulated Wall System Started - Rear.

Upper Floor Plasterboard Complete.

Upper Floor Plasterboard Complete.

Upper Floor Wet Area Tiling Complete

Upper Floor Wet Area Tiling Complete.

IMG_1100

Upper Floor Insulated Wall System Co

Upper Floor Insulated Wall System Complete - Front.

Upper Floor Insulated Wall System Co

Upper Floor Insulated Wall System Complete - Front.

Upper Floor Insulated Wall System Co

Upper Floor Insulated Wall System Complete - Front.

Upper Floor Insulated Wall System Co

Upper Floor Insulated Wall System Complete - Rear.

IMG_1074

New Brickwork to existing Garage for Staircase Complete.

IMG_1076

New Brickwork to existing Garage for Staircase Complete.

IMG_1181

Existing Alfresco Structure Demolished.

IMG_1156

Existing Roof Timbers being Demolished - Front.

IMG_1154

Existing Roof Timbers being Demolished - Rear.

Upper Floor Arriving in Pieces.

Roof Frame Gone and SteelS Beams Being Installed

IMG_1199

New Alfresco Steel Beams Installed.

Upper Floor Arriving in Pieces.

Upper Floor Arriving in Pieces.

IMG_1213

Inside one of the Upper Floor Pieces.

IMG_1282

Crane Lifting First Piece of Upper Floor.

IMG_1284

Crane Lifting First Piece of Upper Floor.

IMG_1295

Crane Lifting First Piece of Upper Floor.

IMG_1314

Third Piece of Upper Floor Arriving

IMG_1409

IMG_3021

IMG_3024

IMG_3016

IMG_3015

IMG_3013

IMG_0412

IMG_0394

IMG_0367

Proudly created by Revere Consulting